Raleigh, North Carolina. Working across NC, VA and SC
Know the ground before you break it.
Phase I and II site assessments, stormwater design, permitting and remediation oversight for agencies, primes and developers. One project manager from the scope call to the closeout binder.
NAD83 / NC State Plane, US ftN 35.87120 W 78.55210Ground 364.0 ftScale 1:2,400 200 ftContour interval 2 ft, index 10 ft
Four disciplines, read like a map legend
Every symbol on the plan above is something we produced on a real-world job type. Fees are starting points for a typical single parcel in the Southeast; federally funded and multi-site work is priced from the scope.
Environmental site assessments
ASTM E1527-21 Phase I reports that lenders and agencies accept, and Phase II sampling only when a recognized environmental condition calls for it.
Phase I ESA
10 to 15 days
Phase II soil and groundwater
3 to 6 weeks
Asbestos and lead surveys
1 to 2 weeks
Phase I from$2,400Fixed fee, single parcel
Stormwater design
Hydrologic modeling, BMP sizing and erosion control plans written to the local ordinance and the reviewer's checklist, so plan review comes back in fewer rounds.
SWPPP and NOI filing
1 to 2 weeks
BMP and detention design
4 to 8 weeks
Post-construction inspections
Recurring
SWPPP from$1,800Fixed fee, up to 10 acres
Permitting
Every permit mapped on day one with a critical-path date, then carried through agency comments until it is issued. You get a tracker every Friday.
NPDES construction general permit
2 to 6 weeks
Section 404 and 401 wetlands
3 to 9 months
Land disturbance and grading
4 to 10 weeks
Permit roadmap from$1,500Credited to the full scope
Remediation oversight
Independent oversight of excavation, disposal and confirmation sampling, with a daily field report the owner and the regulator can both read.
Corrective action plans
4 to 8 weeks
Field oversight and sampling
Daily rate
Closure reports
2 to 4 weeks
Field oversight from$1,150Per field day, crew of one
Project register, one river basin
Seven recent job types plotted on the upper basin we work in most. Select a marker or a row to read the scope. Client names and exact locations stay confidential.
Upper basin, Wake and Johnston counties. Locations generalized
7projects shown
158acres covered
0notices of violation
How a job runs, station by station
Same five stations on every project, whether it is a single Phase I or a fourteen-month inspection contract.
STA 0+00
Scope call
Thirty minutes with the project manager who will run your job, not a sales lead.
Day 1
STA 1+00
Proposal
Fixed fee or time and materials, with schedule, assumptions and exclusions in writing.
Within 3 business days
STA 2+00
Field work
Records review, site reconnaissance, borings or survey. Utility locate confirmed first.
72 hours after NTP
STA 3+00
Findings and design
A one-page findings memo first, then the full report or the PE-sealed plan set.
Per scope schedule
STA 4+00
Permits and closeout
Agency comments answered inside five business days, then a closeout binder.
Until issued
Three kinds of client, three ways of reporting
A county capital program, a prime contractor and a private developer need different things from the same discipline. We set reporting, invoicing and contact rhythm to match.
Government agencies
Municipal, county, state DOT and federal facility work. Set up for task-order contracts, prevailing wage and the documentation an auditor will ask for.
Typical work
Stormwater retrofits, facility Phase I, MS4 inspections
Reporting
Monthly progress reports tied to task-order line items
Primes and contractors
We team as a subconsultant on design-build and CM at-risk pursuits, with a scope letter and fee you can drop straight into your proposal.
Typical work
SWPPP, erosion control inspection, soil management plans
Reporting
Inspection logs within 24 hours, shared with your superintendent
Developers and owners
Due diligence windows are short. We tell you early whether a parcel has an environmental problem and what fixing it costs, before you close.
Typical work
Phase I and II ESA, entitlement permitting, site civil
Reporting
A one-page findings memo ahead of the full report
Safety record, stated plainly
Our people work beside open excavations, live traffic and impacted soil. Every field day starts with a job hazard analysis signed by the whole crew.
0Lost-time incidents, last 3 years
0.72Experience modification rate
100%Field staff with 40-hour HAZWOPER
Site-specific health and safety plan for every intrusive task
OSHA 10 for all staff, OSHA 30 for field leads
Utility locate ticket confirmed before any boring or test pit
Stop-work authority for everyone on our crew, used without penalty
Registrations and codes
Contracting officers and primes ask for these first, so here they are.
Sealed by a Professional Engineer licensed in the state where the work sits
Contracting
Prime or subconsultant, task order or single scope
What project managers say after closeout
From the closeout surveys we send at the end of every job.
Phase I ESA11 days
The Phase I came back in eleven days with a one-page memo on day six. We had the underground tank answer before our diligence window closed, which was the whole point.
Dana R., development manager, mixed-use project
SWPPP inspections14 months
Inspection logs were in our inbox the same afternoon, every week, for fourteen months. When the state showed up for a site visit, nothing was missing.
Marcus T., superintendent, general contractor
Task orderCounty program
Their progress reports matched our task-order line items exactly. Our finance office stopped sending invoices back for clarification.
Priya K., capital projects manager, county agency
Questions procurement and PMs ask first
Something else on your mind? The project desk answers the phone 7am to 6pm Eastern: (919) 555-0178.
Can you start before the contract is fully executed?
We can hold a crew date on a signed letter of authorization and begin desktop work such as records review and permit mapping. Intrusive field work waits for a notice to proceed and a confirmed utility locate.
Do you team as a subconsultant on design-build and federal bids?
Yes. Send the solicitation number and the scope you want covered. Within three business days you get a scope letter, a fee and the forms your team needs, including past performance write-ups and key personnel resumes.
Who seals the plans, and in which states?
Anything that needs a seal is signed by a Professional Engineer licensed in the state where the project sits. If your project is somewhere we do not cover, we say so on the first call rather than quietly subcontracting it.
What happens if the Phase I finds a problem?
You get a short findings memo first: what was found, what it likely means, and what a Phase II would cost and how long it would take. We do not push sampling the findings do not support.
How do you keep permit reviews from dragging?
We book a pre-application meeting where the agency offers one, write to their checklist, and answer comments within five business days. Your PM gets an updated permit tracker every Friday.
Fixed fee or hourly?
Phase I reports, SWPPPs and permit roadmaps are usually fixed fee. Field oversight and open-ended remediation support are billed at published daily and hourly rates, with a not-to-exceed figure agreed up front.
Send us the site. We send back a scope.
A project manager replies within one business day and returns a scoped proposal within three.