Brindle Creek EngineeringEnvironmental and civil, Raleigh NC (919) 555-0178 Request a proposal

Raleigh, North Carolina. Working across NC, VA and SC

Know the ground before you break it.

Phase I and II site assessments, stormwater design, permitting and remediation oversight for agencies, primes and developers. One project manager from the scope call to the closeout binder.

Request a proposal
3 daysto a scoped proposal
72 hrfield crew after NTP
PEsealed in the project state

Four disciplines, read like a map legend

Every symbol on the plan above is something we produced on a real-world job type. Fees are starting points for a typical single parcel in the Southeast; federally funded and multi-site work is priced from the scope.

Environmental site assessments

ASTM E1527-21 Phase I reports that lenders and agencies accept, and Phase II sampling only when a recognized environmental condition calls for it.

Phase I ESA10 to 15 days
Phase II soil and groundwater3 to 6 weeks
Asbestos and lead surveys1 to 2 weeks
Phase I from$2,400Fixed fee, single parcel

Stormwater design

Hydrologic modeling, BMP sizing and erosion control plans written to the local ordinance and the reviewer's checklist, so plan review comes back in fewer rounds.

SWPPP and NOI filing1 to 2 weeks
BMP and detention design4 to 8 weeks
Post-construction inspectionsRecurring
SWPPP from$1,800Fixed fee, up to 10 acres

Permitting

Every permit mapped on day one with a critical-path date, then carried through agency comments until it is issued. You get a tracker every Friday.

NPDES construction general permit2 to 6 weeks
Section 404 and 401 wetlands3 to 9 months
Land disturbance and grading4 to 10 weeks
Permit roadmap from$1,500Credited to the full scope

Remediation oversight

Independent oversight of excavation, disposal and confirmation sampling, with a daily field report the owner and the regulator can both read.

Corrective action plans4 to 8 weeks
Field oversight and samplingDaily rate
Closure reports2 to 4 weeks
Field oversight from$1,150Per field day, crew of one

Project register, one river basin

Seven recent job types plotted on the upper basin we work in most. Select a marker or a row to read the scope. Client names and exact locations stay confidential.

Upper basin, Wake and Johnston counties. Locations generalized

    7projects shown
    158acres covered
    0notices of violation

    How a job runs, station by station

    Same five stations on every project, whether it is a single Phase I or a fourteen-month inspection contract.

    1. STA 0+00

      Scope call

      Thirty minutes with the project manager who will run your job, not a sales lead.

      Day 1
    2. STA 1+00

      Proposal

      Fixed fee or time and materials, with schedule, assumptions and exclusions in writing.

      Within 3 business days
    3. STA 2+00

      Field work

      Records review, site reconnaissance, borings or survey. Utility locate confirmed first.

      72 hours after NTP
    4. STA 3+00

      Findings and design

      A one-page findings memo first, then the full report or the PE-sealed plan set.

      Per scope schedule
    5. STA 4+00

      Permits and closeout

      Agency comments answered inside five business days, then a closeout binder.

      Until issued

    Three kinds of client, three ways of reporting

    A county capital program, a prime contractor and a private developer need different things from the same discipline. We set reporting, invoicing and contact rhythm to match.

    Government agencies

    Municipal, county, state DOT and federal facility work. Set up for task-order contracts, prevailing wage and the documentation an auditor will ask for.

    Typical work
    Stormwater retrofits, facility Phase I, MS4 inspections
    Reporting
    Monthly progress reports tied to task-order line items

    Primes and contractors

    We team as a subconsultant on design-build and CM at-risk pursuits, with a scope letter and fee you can drop straight into your proposal.

    Typical work
    SWPPP, erosion control inspection, soil management plans
    Reporting
    Inspection logs within 24 hours, shared with your superintendent

    Developers and owners

    Due diligence windows are short. We tell you early whether a parcel has an environmental problem and what fixing it costs, before you close.

    Typical work
    Phase I and II ESA, entitlement permitting, site civil
    Reporting
    A one-page findings memo ahead of the full report

    Safety record, stated plainly

    Our people work beside open excavations, live traffic and impacted soil. Every field day starts with a job hazard analysis signed by the whole crew.

    0Lost-time incidents, last 3 years
    0.72Experience modification rate
    100%Field staff with 40-hour HAZWOPER
    • Site-specific health and safety plan for every intrusive task
    • OSHA 10 for all staff, OSHA 30 for field leads
    • Utility locate ticket confirmed before any boring or test pit
    • Stop-work authority for everyone on our crew, used without penalty

    Registrations and codes

    Contracting officers and primes ask for these first, so here they are.

    UEIKQ7MLN3RZ4B6
    CAGE code8T2W5
    NAICS541330Engineering services541620Environmental consulting services562910Remediation services
    EngineeringSealed by a Professional Engineer licensed in the state where the work sits
    ContractingPrime or subconsultant, task order or single scope

    What project managers say after closeout

    From the closeout surveys we send at the end of every job.

    Phase I ESA11 days
    The Phase I came back in eleven days with a one-page memo on day six. We had the underground tank answer before our diligence window closed, which was the whole point.
    Dana R., development manager, mixed-use project
    SWPPP inspections14 months
    Inspection logs were in our inbox the same afternoon, every week, for fourteen months. When the state showed up for a site visit, nothing was missing.
    Marcus T., superintendent, general contractor
    Task orderCounty program
    Their progress reports matched our task-order line items exactly. Our finance office stopped sending invoices back for clarification.
    Priya K., capital projects manager, county agency

    Questions procurement and PMs ask first

    Something else on your mind? The project desk answers the phone 7am to 6pm Eastern: (919) 555-0178.

    Can you start before the contract is fully executed?

    We can hold a crew date on a signed letter of authorization and begin desktop work such as records review and permit mapping. Intrusive field work waits for a notice to proceed and a confirmed utility locate.

    Do you team as a subconsultant on design-build and federal bids?

    Yes. Send the solicitation number and the scope you want covered. Within three business days you get a scope letter, a fee and the forms your team needs, including past performance write-ups and key personnel resumes.

    Who seals the plans, and in which states?

    Anything that needs a seal is signed by a Professional Engineer licensed in the state where the project sits. If your project is somewhere we do not cover, we say so on the first call rather than quietly subcontracting it.

    What happens if the Phase I finds a problem?

    You get a short findings memo first: what was found, what it likely means, and what a Phase II would cost and how long it would take. We do not push sampling the findings do not support.

    How do you keep permit reviews from dragging?

    We book a pre-application meeting where the agency offers one, write to their checklist, and answer comments within five business days. Your PM gets an updated permit tracker every Friday.

    Fixed fee or hourly?

    Phase I reports, SWPPPs and permit roadmaps are usually fixed fee. Field oversight and open-ended remediation support are billed at published daily and hourly rates, with a not-to-exceed figure agreed up front.

    Send us the site. We send back a scope.

    A project manager replies within one business day and returns a scoped proposal within three.

    Proposal requestReply within 1 business day
    Project type

    Choose at least one project type.

    Enter a city or county and state.

    Pick the start window that fits.

    Enter your name.

    Enter a valid email address.

    Your details go to one project manager. No mailing list.

    Proposal request sent

    A project manager will reply within one business day.

    1. Within 1 dayYour project manager calls or emails to book the scope call
    2. Within 3 daysScoped proposal with fee, schedule and exclusions
    3. 72 hr after NTPField crew mobilized

    Need it sooner? Call the project desk at (919) 555-0178.

    Capability summary

    Brindle Creek Engineering, PLLC. Raleigh, North Carolina

    Core competencies

    • Phase I and Phase II environmental site assessments
    • Stormwater management design and SWPPP
    • NPDES, wetlands and land disturbance permitting
    • Remediation oversight and closure reporting
    • Erosion and sediment control inspection

    Company data

    UEIKQ7MLN3RZ4B6
    CAGE8T2W5
    NAICS541330, 541620, 562910
    ContractingPrime or subconsultant

    Differentiators

    • Scoped proposal in 3 business days
    • Field mobilization within 72 hours of NTP
    • Findings memo ahead of every full report
    • PE-sealed work in the project's state

    Past performance types

    • County stormwater retrofit task orders
    • Brownfield redevelopment due diligence
    • Design-build highway SWPPP inspection
    • Former fuel station soil remediation oversight
    Request a proposal

    Point of contact: project desk, (919) 555-0178, proposals@example.com