Lintel & PineBuilders, Boise

Your finish date goes in the contract.

Kitchens, baths, additions and custom homes across Boise and the Treasure Valley. One fixed price, a week-by-week schedule, and the same project lead from the first visit to the keys.

Front elevation drawing of a Boise home: a gabled main house with board and batten siding, a glulam timber lintel over the front door, a flat-roofed glass wing, and pine trees. A red revision cloud around the front door notes that keys are handed over on the contract date. 30'-0" 25'-6" Glulam lintel, Douglas fir, 5½ x 12 Keys on the date in your contract
Lintel & Pine BuildersProject: your house
PriceFixed, line by line
Finish dateWritten in the contract
Estimate visitWithin 5 business days
LicenseIdaho RCE-41187, insured
A-001, general notes

The three things everyone has heard about contractors.

You have heard the stories from a neighbor, or lived one. Here is how each one is handled on paper, before a single wall comes down.

It went way over budget.

One fixed price, built from a line-item estimate.

We open walls on paper first. Your price lists every trade, material allowance and fee. Nothing changes unless you sign a written change order, with the cost on it, before the work starts.

2.1%Average change on 2025 projects, all of it requested by owners.
It took twice as long.

A week-by-week schedule, and a finish date with teeth.

Cabinets, windows and tile are ordered before tear-out, so your kitchen is never torn out while we wait on a truck. If we miss the contract date for reasons we control, we pay you for every day.

41 of 44Projects in 2025 finished on or before the contract date.
They stopped showing up.

One project lead, a Friday report, a crew on site daily.

Your project lead answers the phone, walks the site every morning, and sends a Friday report with photos and next week's plan. Payments follow finished work. They never run ahead of it.

52 of 52Weeks last year with a Friday report sent on every active job.
A-100 to A-301, recent work

Recent work, drawn the way we plan it.

Every project starts as a set of drawings. Here are five from the past two years, with the week we promised and the week we handed over keys.

20'-8" 36" Drawer bank, soft close
SheetA-201

North End kitchen

Wall removed, new island, 200 amp panel upgrade.

Contract$92,400
Promised, doneWeek 16, week 16
Curbless shower Bench Linear drain Primary bath Double vanity, 72" Pocket door 14'-2" 8'-4" No step, 2% slope to drain
SheetA-102

Bench primary bath

Tub out, curbless shower in, heated floor.

Contract$46,800
Promised, doneWeek 12, week 11
Kitchen Living Bath Primary Bed 2 Bed 3 New island Wall out, beam in 56'-0"
SheetA-101

Collister whole-home

1962 ranch, opened up, rewired and replumbed.

Contract$268,000
Promised, doneWeek 26, week 25
Existing New suite 420 sq ft over family room 24'-0" Tie-in to existing roof
SheetA-301

Harris Ranch addition

420 sq ft suite over a new family room.

Contract$214,500
Promised, doneWeek 30, week 29
38'-0"16'-0" Low-e glass, south face
SheetA-200

Foothills custom home

2,850 sq ft, built on the owner's lot in Boise's north foothills.

Contract$1.08M
Promised, doneWeek 48, week 48
Sheet 1 of 5
S-001, construction schedule

See your build, week by week.

These are the schedules we write into contracts for typical projects. Pick a project and a month to sign, then tap any bar to see what happens in that phase and when you pay.

Estimate to keys16 weeks
Crew working in your home8 weeks
Tear-out day, about-
Contract finish, about-

Times shown are for a typical project of that type. Yours is set after the on-site estimate and printed in the contract.

Book a kitchen estimate
G-001, the date

$250a day, off your final payment, for every day we finish late.

Contract date

The date is written down

Your contract has a finish date, not a range. It is set after design and permits are done, so it is a date we can stand behind.

We pay when we miss it

For every day past that date caused by us, our crews or our suppliers, $250 comes off your final payment. No form to fill in. It shows up on the invoice.

The price does not drift

The number you sign is the number you pay. It only changes through a change order you asked for, priced and signed before the work starts.

What does not count against us: changes you request after signing, city inspection delays beyond 5 business days, and weather days on exterior work, which we log and share with you as they happen.

P-001, sequence of work

From first call to final walk-through, in eight steps.

The same order every time. You always know which step you are in, what comes next, and what you owe.

  1. 1

    Free on-site estimate

    Your project lead walks the house with you, measures, checks the panel, plumbing and framing, and talks budget plainly.

    About 90 minutes at your home
  2. 2

    Line-item proposal

    A written price broken into trades and allowances, a draft schedule, and a few options to bring it under your number.

    Within 7 days of the visit
  3. 3

    Design and selections

    Drawings, then a showroom day for cabinets, tile, fixtures and finishes. Every choice is priced before you commit.

    2 to 5 weeks
  4. 4

    Fixed-price contract

    Final price, finish date and payment schedule in one document, signed once you are ready.

    10% deposit holds your start
  5. 5

    Permits and ordering

    We pull permits and order every long-lead item. Nothing gets torn out until materials are on hand or confirmed.

    2 to 6 weeks, you live normally
  6. 6

    Tear-out and rough-in

    Dust walls and floor protection go up. Framing, plumbing, electrical and HVAC go in and pass city inspection.

    25% after rough inspection passes
  7. 7

    Drywall and finishes

    Insulation, drywall, then cabinets, counters, tile, paint and trim. Photos land in your inbox every Friday.

    20% at drywall, 30% at finishes
  8. 8

    Punch list and keys

    We walk every room with you and fix every item on the list, then hand over keys and a warranty binder.

    Final 15% when the list is closed
C-001, schedule of values

What projects like yours usually cost.

Starting points from our 2025 contracts in the Boise area. Your estimate visit turns these into a fixed number for your house.

Starting prices and typical durations by project type
ProjectStarting atWhat it usually includesEstimate to keys
Bathroom remodelFrom$38,000Full gut of a hall or primary bath: tile, fixtures, vanity, fan and lighting, with waterproofing behind every wet wall.About 12 weeks
Kitchen remodelFrom$68,000New layout, cabinets, quartz counters, appliances installed, lighting and flooring.About 16 weeks
Whole-home renovationFrom$180,000Kitchen, baths, walls moved, new electrical and finishes throughout.About 26 weeks
Home additionFrom$395 / sq ftFoundation to finish, tied into your existing roof, HVAC and electrical.About 30 weeks
Custom homeFrom$340 / sq ftOn your lot, from your plans or ours. Site work priced separately after a soils report.44 to 52 weeks

Every proposal includes a 5% contingency line. If it is not used, it stays yours.

Allowances for tile, fixtures and counters are written as dollar amounts, so you can see exactly where you go over or under.

R-001, owner reviews

From people who lived through the dust.

Reviews from recent clients, with the week they were promised and the week they got their keys.

We had a contractor vanish halfway through a bathroom before. With Lintel and Pine we got a Friday email every single week, and the crew was there by 7:30 every morning. Finished a week early.
Dana R.Primary bath, Boise Bench
Promised week 12, done week 11
The price we signed was the price we paid, plus one change order for an extra outlet that we asked for. They kept our kitchen sink working until the day the new one went in.
Marcus T.Kitchen, North End
Promised week 16, done week 16
Our addition hit a two-week city backlog on the framing inspection. They showed us the logged dates, adjusted the plan, and still handed over keys before the contract date.
Priya and Sam K.Rear addition, Harris Ranch
Promised week 30, done week 29
Next step

Book a free on-site estimate.

Tell us a little about the project. We call within one business day to set a visit time, usually within the week.

  • Your project lead comes to youThe person who will run your job, not a salesperson.
  • Written proposal in 7 daysLine-item price, draft schedule, no pressure to sign.
  • No cost, no obligationThe visit and the proposal are free, whatever you decide.
Rather talk now?(208) 555-0174Mon to Fri 7 to 5, Sat 8 to noon
  1. 1Your project
  2. 2Your visit
What are you planning?
When would you like to start?

Takes about a minute. Next, pick a visit time.

Questions people ask before they sign.

Something else on your mind? Ask at the estimate visit, or call (208) 555-0174.

What happens if you open a wall and find a problem?

During the estimate we check the attic, crawlspace and panel, so most surprises are priced up front. If we still find something hidden, like rot or old knob-and-tube wiring, we stop, show you photos, and price the fix in a written change order. You decide before any extra work starts.

How do payments work? Do you want a big deposit?

10% at signing to hold your start date. After that, payments are tied to finished, inspected milestones: 25% after rough inspection, 20% at drywall, 30% at finishes, and the last 15% after your punch list is closed. You never pay ahead of the work.

Can we live in the house during the remodel?

Most kitchen and bath clients do. We put up zip-door dust walls, protect floors, and clean up every afternoon. For kitchens we can set up a temporary sink and counter in another room. Whole-home projects sometimes need a few weeks away, and we plan those weeks into the schedule with you.

Who will actually be in my home?

Your project lead plus our own carpenters, and a small set of licensed plumbers, electricians and HVAC techs we have worked with for years. You get a list of names before tear-out day. Every trade is insured and we check their licenses each year.

Do you handle design and permits?

Yes. Our in-house designer draws your plans, and we submit and track permits with the City of Boise, Ada County, Meridian and Eagle. Permit fees are listed in your proposal as their own line.

What if my budget is lower than your starting prices?

Tell us anyway. We often split a project into phases, keep the existing layout to avoid moving plumbing, or point out where stock cabinets save real money. If we are not the right fit, we will say so at the visit.

What warranty comes with the work?

Two years on our workmanship, in writing, plus the manufacturer warranties on appliances, windows and fixtures, which we register for you. We come back at 11 months for a free check-up visit to adjust doors, re-caulk and fix anything that has settled.